You are at : Home  
    
TANGIER MEDITERRANEAN II PHASE II PROJECT - 2ND LOT STUDY AND CONSTRUCTION WORKS OF THE A-18 MZH CONTAINER DOCK AND HYDRAULIC AND LAND RECLAMATIONS
TANGIER MEDITERRANEAN II PHASE II PROJECT - 2ND LOT STUDY AND CONSTRUCTION WORKS OF THE A-18 MZH CONTAINER DOCK AND HYDRAULIC AND LAND RECLAMATIONSAs part of the same strategy of growth of the port and maritime domain, the leader SOMAGEC had the privilege to implement the project of the new container terminal (TC3) at Tangier Med Port 2 phase 2. This project will connect directly the port to the main cities through an integrated logistics and industrial port platform, connected to a multimodal transport network.
 
CONSTRUCTION OF A NEW CASABLANCA SHIPYARD
CONSTRUCTION OF A NEW CASABLANCA SHIPYARDContinuing its strategy as a leader in port work at the national and African level, SOMAGEC has just won the contract to build a new Casablanca shipyard as part of a joint venture formed with Atlantic Dredging.
 
Wind Farm Tarfaya, Laayoune, Tan Tan
New Wind Farm in Tarfaya, Laayoune, Tan Tan
Wiser for the experience in the area of Civil Engineering and extensive experience in Wind Farm projects, the SOMAGEC has won four projects of Wind Farm in the South of Morocco with a total capacity of 452 MW:
- Wind Farm of Foum Eloued -Laayoune: 50 MW, 63 646 531.00 DH;
- Wind Farm of Akhfenir - Tan Tan: 102 MW, 118 262 418.00 DH;
- Wind Farm of Tarfaya (Geotechnical Study and Works): 300 MW,
300 400 000 DH.
 
Construction of a marina in Tangier City
Construction of a marina in Tangier City
With its solid establishment as a leader in the port sector at both national and African levels, the SOMAGEC Company has just signed two contracts for three major projects on the city of Tangier, regarding two packages of infrastructure, these two packages the conversion of the fishing port of Tangier into a Marina and the construction of a new marina, for a total value of 370 592 958 DH and for a 12 months period for the first part and 22 months for the second. And the construction of the new Port of Fisheries: 581 839 922,00 DH / 30 Months.
 
  The quality is our dutty
 
  Download space
Projects files
Equipment list
 
 
SOMAGECGE Guinée Equatoriale
waste collection; Always at the service of the environement; camion
J'aimes Somagec
SINOTRUK Tracteur; SINOTRUK Porteu; BAW Minibus; BAW Fourgon; ZHONGTONG Bus
 
Head Office, Office and warehouses : Angle rue Mohamed El Mesfioui & Corbi - Oukacha - CP 20250 - Casablanca 05 - Maroc
Phone: (212) 522-35-49-45/46/47, (212) 522-35-44-23, (212) 522-35-47-87/88/89
Fax: (212) 522-35-44-24, (212) 22-35-59-95
E-mail: somagec@somagec.ma Webmaster